Jinan Dubai Environmental Protection Material Co., Ltd. is a professional enterprise specializing in the research and development of metal wall engraving panels, interior wall metal engraving panels and exterior wall metal engraving panels of various colors and shapes of exterior wall insulation and interior wall decoration integrated panels. Brick pattern, elastic coating, water ripple, wood grain, cultural stone pattern, wide and narrow brick pattern, marble, pure equal pattern and color, meet the architectural appearance and color appearance requirements, achieve a certain artistic effect.
1. Dry construction process: The dry construction of the Central Asian carved plate is not affected by the season and the climate, and truly solves the problem of the original traditional thermal insulation wall cracks, heat and cold bridges, and embodies the external wall self-insulation technology. , greatly improving the thermal performance of the building envelope structure, reducing the loss of energy in the building, and receiving the effect of warm winter and cool summer.
2, the embodiment of energy-saving rooms: can increase the indoor temperature by more than 4 °C, with sound insulation, heat preservation function, reduce noise pollution of residents, and improve the grade of the room, but also strengthen the wall to reduce the weight of the original building It also extends the service life of the building, reduces the energy loss of the building, achieves the effect of warm winter and cool summer, and saves electricity and heating costs, and improves the living environment and quality of life of the residents.
3, the construction is simple, fast, reliable, adaptable, scientific and reasonable, and has a high cost performance.
4. The production of sheet metal adopts factory mechanized flow operation, which avoids the quality instability factors in the manual production of manual on-site operation, eliminates the artificial quality problem, makes the product clear at a glance, guarantees the construction quality, and the Central Asian metal engraved board will keep the external wall insulation. The multi-process of on-site construction has become factory production.