The construction process of the metal engraved board is as follows:
1. Release the line, according to the requirements of the design drawings and the geometric dimensions, hang the large surface of the metal panel to be inlaid, and carry out the actual measurement and release line to determine the size and quantity of the facing wall panel.
2. Fixing the skeleton connecting piece, the horizontal and vertical rods of the skeleton are fixed by the connecting member and the structure, and the connecting bolt and the structure are fixed by the expansion bolts, and the line is opened at the bolt position during the construction.
3, fixed skeleton, the skeleton is installed after anti-corrosion treatment, the position should be accurate, the combination needs to be firm, after the installation, the center line and the surface elevation should be fully inspected. In order to ensure the installation accuracy of the veneer, the theodolite should be used for the horizontal and vertical bars. Through, the deformation joint needs to be properly disposed.
4, metal veneer installation, the installation order of the wall panels is from the edge of each wall vertical to the first row of the first lower plate, bottom-up installation, after installing the first row of the wall Then install the second row. After each installation of 10 rows of wall panels, the wire should be inspected once to eliminate errors in time.