Hello! Welcome to the website of Jinan Dibaier Environmental Protection Materials Co., Ltd.!


    0531-83540183        Alibaba Store

产品分类

Contact

Jinan Dibaier Environmental Protection

 Materials Co., Ltd.Contact: Du

Tel: 0531-83540183

Mobile: 13573779499

Fax: 0531-83540183

Mailbox: jinandibaier@163.com

Address: No.:24760-1st,3rd Road,Longshan, Zhangqiu District,Jinan,Shandong

Website: www.jndibaier.cn

Website:en.jndibaier.cn


Metal carved integrated board room

Your current location: 首 页 >> Products >> Rough Brick Metal Carved Plate

Metal carved integrated board room

  • Classification:Rough Brick Metal Carved Plate

  • Clicks:
  • Release date:2019/11/16
  • Inquiry
  • Details

外墙金属雕花板

Detailed preparation of rough brick metal carved board installation

1. When the main frame structure is completed, it should be measured according to the design requirements, according to the actual situation of the site, draw the layout drawing, and process the finished wallboard.

2. The installation plan or operation instruction book should be prepared before installation. The construction plan should be approved by the engineer, and the operation instruction book should be approved by the technical person in charge of the branch.

3. Before the installation of the brick-shaped metal engraved board, the technical safety shall be carried out step by step according to the construction plan or the operation instruction book. The person handed over and the person to be handed over shall sign the record of the delivery.

4. The brick-shaped metal carved board has been transported into the construction site, stacked according to the number and checked and checked in all aspects according to the design requirements and specifications. The quantity, specification, model, thickness and appearance quality should meet the requirements. For wall panels that do not meet the requirements, they should be returned immediately. It is strictly forbidden to use unqualified products for engineering.

5, according to the design requirements to find the elevation of the horizontal line on the oblique beam, according to the panel manufacturer's board diagram to accurately position the embedded parts, find the center line of the embedded parts, and play a good line.

6. Check the quantity specifications of chemical anchor bolts, steel plates and angle steels, which should meet the requirements for continuous installation.

7. The mechanical equipment used for the installation of the brick-shaped metal engraved board has entered the construction site, and is inspected for repair and maintenance. In good condition, the tools required for wall panel installation are ready.

If you want to make the performance of the coarse-grained metal carved plate fully visible, it is very necessary to prepare completely in terms of selection and installation. After all, as the saying goes, "If you want to do something good, you must Let's take advantage of it first, so I hope everyone can pay more attention before using it.



外墙金属雕花板

外墙金属雕花板

粗砖纹.jpg

  • Service
  • number
    13573779499
  • Message
  • Online Service
    Welcome to our message.
    Content
    Name
    Name
    Tel
    Tel
    Email
    Email
    Add
    Add