Hello! Welcome to the website of Jinan Dibaier Environmental Protection Materials Co., Ltd.!


    0531-83540183        Alibaba Store

产品分类

Contact

Jinan Dibaier Environmental Protection

 Materials Co., Ltd.Contact: Du

Tel: 0531-83540183

Mobile: 13573779499

Fax: 0531-83540183

Mailbox: jinandibaier@163.com

Address: No.:24760-1st,3rd Road,Longshan, Zhangqiu District,Jinan,Shandong

Website: www.jndibaier.cn

Website:en.jndibaier.cn


Exterior metal sheet

Your current location: 首 页 >> Products >> Elastic Coated Metal Carved Plate

Exterior metal sheet

  • Classification:Elastic Coated Metal Carved Plate

  • Clicks:
  • Release date:2019/11/16
  • Inquiry
  • Details

金属雕花保温板

Pay attention to the following points in the construction of exterior metal panels:

First, the original structure and decoration cannot be destroyed.

Second, the transformation of the outer wall should fully consider the role of decoration, the outer wall metal plate to achieve insulation, waterproof and decoration integration.

Third, different heights will be very different in construction. The best time for construction should be tailored.

It is believed that there is nothing after the construction of the exterior metal panels. This is not correct. Next, Xiaobian will give you a brief explanation of the precautions of the exterior metal panels after construction. I hope that they can help everyone.

1. After the completion of the construction, it is not advisable to carry out the construction work such as welding and drilling on the wall and roof of the external thermal insulation material, and the exposed external thermal insulation materials shall be disposed of.

2. Fire protection measures such as wearing pipes should be taken, and electrical circuits should not pass through flammable external insulation materials.

3. When doing other constructions, meet the fire and water supply requirements for fire fighting at the construction site. The indoor and outdoor temporary fire hydrant systems shall be installed at the construction site.

4. No flammable materials should be stacked on the grooves, platforms, etc. adjacent to the external wall and the roof.

5, the fire source should be away from the outer wall metal plate.

6. The welding and other processes should be carried out before the insulation materials are laid. It is necessary to lay fireproof blankets and other fire protection measures around the welding parts after the insulation materials are laid.


金属雕花保温板

金属雕花保温板

弹涂纹.jpg

  • Service
  • number
    13573779499
  • Message
  • Online Service
    Welcome to our message.
    Content
    Name
    Name
    Tel
    Tel
    Email
    Email
    Add
    Add