Metal engraving plate aluminum alloy fittings installation process
1. Board connector installation
Ensure the levelness and verticality of the connecting fasteners, and pay attention to the tightness of the fasteners and plates. The yin and yang angles are checked vertically with a 2m tow plate, the yin and yang angles are checked with a right angle inspection ruler, and the joint height is checked with a steel ruler.
2. Yin and Yang corner fastener installation
The joint between the fastener and the plate is anchored with rivets, and the rivets are pre-treated to match the color of the plate. The rivet spacing is generally based on the height of the plate.