Metal carving board installation steps

Your current location: Home >> News >> Company News

Metal carving board installation steps

Release date:2019-04-11 Author: Click:

The metal engraved board is not only beautiful, but also has many patterns and a good thermal insulation effect. It is very popular among consumers. If you want it to have a good effect, then we have to install it correctly. Let me introduce its installation steps:

1. When the main frame structure is completed, it must be measured according to the design requirements, according to the actual situation of the site, draw the layout diagram and then process the wallboard.

2. The installation plan or operation instruction book should be prepared before installation. The construction plan should be approved by the engineer. The operation instruction book should be approved by the technical person in charge of the branch.

3. Before installing the wallboard, technical safety should be carried out step by step according to the construction plan or operation instructions. The person who is handed over and the person to be handed over should sign the record.

4. The metal carved panel wall panel has been transported into the construction site, stacked according to the number and checked and checked in all aspects according to the design requirements and specifications. The quantity specification, model and thickness and appearance quality should meet the requirements. Wall panels that do not meet the requirements should be returned immediately, and unqualified products are prohibited from being used in engineering.

5, according to the design requirements to find the high level on the diagonal beam to pop up the horizontal line, the manufacturer of the installation of the wall board layout plate to accurately position the embedded parts, find the center line of the embedded parts, and play the line.

6. Check the quantity specifications of chemical anchor bolts, steel plates and angle steels, which should meet the requirements for continuous installation.

7. The mechanical equipment used for wall panel installation has entered the construction site, and inspection, repair and maintenance are carried out. The tools required for wall panel installation are ready.

The installation of metal engraved board is the first step we use, so it is especially important. It can't be sloppy. When installing, the manufacturer will have instructions. We need to install according to the instructions, so as to reduce the occurrence of faults and repeat inspection after installation. .