1. Renovation is simple and easy to construct: the light steel keel is connected with the wall, and the requirements for the base layer such as flatness and humidity are low, which simplifies the treatment of the base layer; if the original base layer is paint, paint or ceramic under certain conditions, it is not even Need to be removed, can directly install metal embossed plate due to plug-in installation; less process, quick construction, short construction period, reduce the interference time of construction on work and life, and save various construction costs
2. Strengthen the protection of the original structure: due to the use of high-strength light-weight plates, it will not increase the load of the building structure; effectively reduce the damage to the building structure during the construction process; superior waterproof and moisture-proof performance, and double-wall structure of the hot aisle to ensure good construction. Respiratory, effectively protect the main structure of the building and extend the life of the building.
3, improve the appearance of the old building grade: there are a variety of patterns and exterior wall tiles and other hundreds of colors to choose from, can change the old appearance of the original building; decorative taste is elegant and elegant, can effectively improve the building taste, is widely applicable to large Hotels, villas, schools, small to thousands of households, etc.
4, improve the energy-saving effect of the original building: Jinan Dubai, due to the selection of the preferred rigid foamed polyurethane insulation layer, can effectively improve the building insulation, thermal insulation performance, reduce energy consumption, reduce the cost of building for heating, cooling, improve construction The comfort of the house uses metal embossed plates, metal carved plates, metal insulation boards, and composite panels. Compared with ordinary buildings, the indoor temperature in summer is 3-5 degrees Celsius lower than that in winter; the indoor temperature in winter is 3-5 degrees Celsius. Effectively reduce the air-conditioning electricity costs for heating and cooling in the house. The owner can save the electricity cost in 5-8 years and can effectively recover the material cost.
5, green material, green construction: due to the use of finished installation, reduce the accumulation of on-site debris, avoid dust, cast clean construction, reduce on-site processing, short construction period, low construction noise, old building renovation process, not It will have a great impact on the office and life of people in and around the building.
6, cost-effective: due to the use of interior wall metal carved panels, the construction cost is medium, so it is worth the money.